Projects
Tax reinvestment zone number one, Irving Texas
Plan Summary
|
Assets, Incremental Contribution and Deposits |
Amounts |
|
City of Irving Contribution of O&M Taxes to TIF (22.5% Retained by City) |
77.5% |
|
Irving ISD Contribution of Ad Valorem Taxes to TIF (75% to School Projects) |
25 % |
|
Carrollton-Farmers Branch Contribution of Ad Valorem Taxes to TIF (67% to School Projects) |
33 % |
|
Dallas Community College District Contribution of O&M Taxes to TIF (100% to TIF 1999-2002 and 50% to School Projects 2003-2013) |
50 % |
|
Annual Deposits to the TIF (Reviewed annually by TIF Bd. &City Council)
Infrastructure Construction Reimbursements and Marketing and Land Use Studies
Other Projects
Projects permitted by the Zone Act |
60 %
23 %
17 % |
|
SUMMARY OF PROPOSED PROJECTS |
|
|
Paving, Drainage and Utilities (PDU): |
|
|
PDU1. Las Colinas Boulevard from Lake Carolyn Parkway
to Colwell Boulevard |
$5,582,470 |
|
PDU2. East Las Colinas Boulevard from Leone Drive to
909 East Las Colinas Boulevard (Computer Associates) |
$1,510,000 |
|
PDU3. Lake Carolyn Parkway from Las Colinas Boulevard
to OConnor Boulevard |
$2,656,200 |
|
PDU4. Urban Center North Roadways |
$5,481,650 |
|
PDU5. Buffalo Boulevard from OConnor Boulevard to IH635
Frontage Road |
$1,782,700 |
|
PDU6. PUD No. 4 Roadways |
$6,756,800 |
|
PDU7 Public Street in NL College to Connect to IISD Academy |
$1,900,000 |
|
Flood Control (FC): |
|
|
FC1. North Lake Carolyn Storm Water Pump Station |
$7,686,000 |
|
FC2. Urban Center Levee |
$956,480 |
|
FC3. Royal Lane Lake and Walls |
$1,836,100 |
|
Storm Drainage (SD): (Irving ISD will not be participating in these projects) |
|
|
SD1. Box culvert from Colwell to Hackberry Creek |
$1,878,800 |
|
SD2. Cottonwood Creek improvements from SH348 to
Hackberry Creek |
$1,281,000 |
|
SD3. Lake Remle channel improvements to Hackberry Creek |
$390,400 |
|
SD4. Cottonwood Creek Silt Detention Basin |
$500,000 |
|
Sanitary Sewer (SS): |
|
|
SS1. Colorado Drive Sanitary Sewer Pumping Station |
$1,220,000 |
|
Park and Open Space (PO): |
|
|
PO 1 Centennial Park |
$3,000,000 |
|
PO2 Park and open space ($1M proposed add $2M) |
$3,000,000 |
|
Area Personal Transit (APT): |
|
|
APT4. APT/DART Local Share Reinvestment Zone funding @ 15% |
$17,500,000 |
|
Other Items |
|
|
Water/Sewer System Repairs |
$10,300,000 |
|
Project Costs Allowed Under the TIF Act |
$25,000,000 |
|
Waterway Desiltation |
$10,000,000 |
|
Lake Carolyn Amenities - pedestrian promenade, landscaping and fountain features around lake perimeter |
$5,500,000 |
|
Land Use Study - review of current land use plans including deed restrictions by expert land planning firm or the Urban Land Inst. |
$200,000 |
|
Marketing Plan - promotional and educational marketing of plan of area |
$200,000 |
|
TIF Administration (Irving ISD will not be participating in this cost) |
$3,200,000 |
|
Subtotals |
$119,318,600 |
|
City, College AND School District Requirements |
|
|
Irving ISD costs for constructing and equipping a high school academy; land and costs for constructing and equipping a future K-8 school on approximately 25 acres; administration, operation and maintenance expenses associated with the high school academy and K-8 school; and payments on bonds issued by IISD to fund the costs of the foregoing educational facilities. |
$125,100,000 |
|
Carrollton/Farmers Branch ISD land and costs for constructing and equipping an elementary school/technology center building and related facilities on a 10-15 acre site; land and costs for constructing and equipping a middle school/technology center building and related facilities on a 20-25 acre site; administration, peration and maintenance expenses associated with the elementary school/technology center and the middle school/technology center; and payments on bonds issued by CFBISD to fund the costs of the foregoing educational facilities. |
$72,600,000 |
|
Dallas Community College District remodeling, repair, reconstruction; and, expansion of North Lake College facilities |
$2,800,000 |
|
Subtotals |
$200,500,000 |
| |
|
|
TIF Plan Total with Taxing Entities' Projects |
$319,818,600 |
|